Aspect were appointed by a local client to internally renovate an existing pool house, plant room and changing room.
The walls and ceilings were looking tired and in need of some rejuvenation. We made good and prepped the walls and ceiling and painted them using specialist high moisture resistant Zinsser perma-white interior paint. The making good of the walls and ceilings was likely to create a lot of dust and debris. Careful consideration and preparation was taken to ensure the pool was completely protected and the pool filtration and heating systems were able to remain in operation. Once protected, a working platform was used to span the pool and provide a safe working access for our team of decorators. The works were completed in five working days and the pool reopened in time for the family to use at the weekend.